To the ones who live in float, paths, and calendars, this space is where we unapologetically nerd out with you. Follow us to see how we’re building scheduling best practices and P6 standards to support schedulers and the wider project team.
Keeping dates, costs, and risk under control starts with project controls fundamentals.
We handle them for you.
Nodes & Links connects right into your existing ecosystem, creating a true ScheduleOS for the entire team.
Use our APIs to feed insights into Power BI, or pull schedules directly into Nodes & Links. Or do both, and create a seamless flow across your ecosystem.
Our cloud-first infrastructure supports flexible integrations without adding maintenance or security overhead for your team.
Work hands-on in Platform Mode when you need full control, detailed checks, and the technical depth required for credible schedules and assurance.
Switch to AI Mode when you want fast answers in plain language, like “what changed?”, “what’s driving this slip?”, or “where are the biggest risks?” using the same trusted schedules and expert foundations.
A deep workspace for schedulers, plus an AI front door for anyone, including schedulers, who needs answers fast.