New: Document Integrations with Aconex and Procore are live. See what your AI can read now

Use cases / Quality and compliance

Quality and compliance

Does this schedule meet our standards, and can we accept it?

Check every submission against your standard the moment it lands.

AI ModeDC EchoAuditable
Does this schedule meet our standards, and can we accept it?
Routed throughIntegrityDCMA checksChange Control
  • Open ends and missing logic
  • Constraints checked against your standard
  • Changes since the baseline
New version checked against your integrity standard. Result sent to the PMO lead.

Ask the AI. Or check the math yourself.

Same ground truth models underneath. Flip between the answer and the Integrity view behind it.

DC Echo Latest scheduleAI Mode
Does this schedule meet our standards, and can we accept it?

Not yet. Integrity is 84.9%, but four checks break your standard.

  • Missed Tasks79%
  • Resources47.1%
  • Negative float38.5%
IntegrityDCMA checksChange Control
Evidence trail attached

Asked in AI Mode

Real questions. Real answers.

Trust your schedule before you act on it. AI Mode checks logic, float and data quality in seconds and shows you exactly what to fix.

Real customer projects, anonymized

AI ModeElectricity transmissionAuditable

“The contractor says 97.9% of links are Finish-to-Start, so no action is needed. Is that accurate?”

What AI Mode found32%

The figure covered 382 of 1,179 links. Across the full schedule it was 91.4%, with part of the schedule below the 90% DCMA threshold and 17 Start-to-Finish links unreported.

Why it mattered. The owner had four specific corrections to send back, with an evidence file behind every one.

From your data to a decision you can defend.

01 · Your data
  • Schedule versions
  • Baselines
  • Your standards
  • Contracts
02 · Ground truth models
  • Integrity
  • DCMA checks
  • Change Control
03 · Evidence trail
  • Open ends and missing logic
  • Constraints checked against your standard
  • Changes since the baseline

Open any answer in Platform Mode and check the math yourself. How it works

FAQ

Questions, answered.

Questions about integrity and compliance.

Talk to our team

The 14 DCMA checks plus proprietary checks, run across every WBS and activity and scored green, amber or red against your thresholds.

Yes. Set a workspace default, adjust it per project if needed, and see exactly where any project differs from the standard.

Yes. Automated workflows check each update the moment it lands and alert the right people if it breaks your standard.

Yes. Go from the overall score to the exact activities failing any check, and export them in one click.