New: Document Integrations with Aconex and Procore are live. See what your AI can read now

Grid modernisation, on time and on budget.

Grid delays mean outages and lost revenue. See risk early, test your contingency plans and keep commissioning dates.

AI Mode
Power and grid program
Auditable
Which packages are most likely to miss energisation, and why?
  • Line 2 tie-inPermit risk
  • Substation NWatch
  • Cable routeRecovered
  • Substation EOn track
Energisation risk summary sent to the programme director

What makes it hard

Grid projects rarely slip for one reason.

01

Ageing infrastructure

Upgrades land on live networks, where outage windows are fixed and hard to move.

02

Permitting delays

One late consent can hold up a whole route, and the knock-on is easy to miss.

03

Supply chain risk

Transformers, switchgear and cable arrive late, and the critical path moves with them.

Customer story

Client confidential

A leading utility provider

Accelerating a transmission line expansion with AI.

Challenge

Recurring delays on a major transmission line expansion, driven by permitting issues and material shortages.

What changed

Automated schedule analysis flagged risks early, and AI scenario planning tested the response before the delay landed.

11x
faster schedule adjustments, from weeks to hours
200+ hrs
saved every month on manual risk assessment
6x
more insight into bottlenecks and supply risk
100%
on-time commissioning

Built for both sides of the project

The same answers, whichever side you’re on.

Utilities and grid operators

Stay in control. Build a more resilient grid.

  • Know more than your contractors
  • Predict delays and plan contingencies
  • Commission on time and integrate with the grid
For owners and operators
EPCs and Tier 1 contractors

Build smarter. Deliver faster.

  • Adapt to change without slowing down
  • Keep subcontractors and crews in sync
  • Spot and resolve risks instantly
For general contractors

The decisions grid teams bring to it

Ask the question. Get the proof.

Explore Risk and forecasting
Risk and forecastingAuditable
Which risks are about to hit, and what do we do first?
  • P50 and P80 completion dates
  • Top risk drivers
  • Mitigations ranked by impact

One-pager

Take it to your next steering group.

Nodes & Links for power and grid: the results, the decisions it answers and how teams get started, on one page.

Download the one-pager

We will never share your details with third parties. See our privacy policy.

FAQ

Questions, answered.

Questions from grid teams.

Talk to our team

Yes. It connects to Oracle Primavera Cloud, Primavera P6 and Microsoft Project, reads documents from Aconex, Procore, Autodesk and Trimble, and takes anything else by API or upload.

Yes. Integrity checks every submission against your standard as it lands, and shows what needs fixing before you accept it.

Yes. Customer data is never used to train AI or LLM models, and each customer’s data stays in its own environment.