A schedule said it passed. AI Mode showed the check covered only 32% of it.

32%
of links the contractor’s check actually covered
91.4%
Finish-to-Start across the full schedule
17
Start-to-Finish links left unreported
The decision

“The contractor says 97.9% of links are Finish-to-Start, so no action is needed. Is that accurate?”

  1. The challenge

    The contractor reported that 97.9% of links were Finish-to-Start, so no action was needed.

  2. What Nodes & Links showed

    AI Mode checked the claim against the full schedule. The figure covered only 382 of 1,179 links.

  3. The result

    Across the whole schedule it was 91.4%, with part below the 90% DCMA threshold. The owner sent back four corrections, each with evidence.

Under the hood
Integrity
DCMA checks
Change Control

FAQ

Questions, answered.

About this customer story.

Talk to our team

Yes. Every story comes from a real customer project. Some are anonymized to protect sensitive programs.

They’re listed under “Under the hood” on this page, with a link to the full use case.

Every project is different, but the same models and AI Mode are available to every customer. Book a demo to see them on projects like yours.

On the Customers page, where you can filter every story by use case.