Platform / AI Mode

The AI built for project controls.

Ask anything about your projects in plain language. Every answer runs through the ground truth models, shows its reasoning and cites every source.

AI Mode New chat
Grounded
@DC Echo Is energization of Data Hall 1 still on track? May progress report.pdf
REASONING · 4 STEPS
  • Loaded DC Echo, schedule version 14
  • Ran Delay Navigator on H.B.1002
  • Checked 3 change orders and 12 RFIs
  • Compared with the approved baseline

No. Energization is now 21 days late. C.U.2006 switchgear delivery drives most of it, and the report claims 89% progress where the schedule supports 79.9%.

Models
Delay Navigator
Progress
Sources
Version 14
May progress report
Open C.U.2006 in Platform Mode
Save to Space
Export to PowerPoint

Ask anything

Ask about any project, in your own words.

One project, two versions, your whole portfolio or the document on your desk. Every answer runs through the ground truth models.

AI Mode New chatGrounded
Ask about one project, two versions, or all of them
@DC Charlie What should we plan for over the next two weeks?
@DC Echo v13 @v14 What changed between these versions?
Which projects are slipping this month?
3 of your 7 data center projects slipped this month. DC Charlie moved most.DC Charlie+18dDC Delta+11dDC Foxtrot+6d

Trust every answer

Every answer shows its work.

See each reasoning step, the models used and every source, then open any activity straight into Platform Mode.

AI Mode Reasoning5 steps
Why is energization late?5 steps · 4.4s
Loaded DC Echo, schedule version 142,180 activities, against baseline v1Schedule data0.4s
Traced the delay to H.B.100214 predecessors, back to the causeDelay Navigator1.8s
Read the change orders and RFIs3 change orders and 12 RFIs, mapped to the WBSDocuments1.1s
Checked logic and floatNo broken links on the driving pathIntegrity0.6s
Compared with the approved baselineFinish moved 21 days laterChange Control0.5s
Answer: switchgear delivery C.U.2006 and change order CO-114 drive 47% of the 21-day slip.

Spaces

Analysis that doesn’t disappear.

Turn any chat and its files into a named Space your team can return to. Spaces carry forward as new schedule versions arrive, so months of analysis are never wiped by the next submission.

  • Convert chat to Space
  • Shared with your team
  • Carries across versions
AI Mode Spaces
3 spaces
SPACES
DC Echo · May submission review
12 chats · 4 files
Claim DN-014 evidence
6 chats · 9 files
Portfolio risk, Q3
4 chats · 2 files
Convert chat to Space
DC Echo · May submission review
Carried over from v12 to v14
FILES
May progress report.pdf
Delay notice DN-014.pdf
Client EVM assessment.xlsx
Meeting minutes, week 21.pdf
CHATS
Does the May report match the schedule?
v12
What changed between v13 and v14?
v14
Draft our response to DN-014
v14

Insights

It raises the questions before you ask.

Every upload generates insights across schedule risk, delay, integrity and progress. Filter them, bookmark the critical ones, share them to the team board, or get the top ones in your inbox.

  • Generated on upload
  • Team board and reactions
  • Insight emails
  • Ask AI in one click
AI Mode Insights
Version 14
50 insights on version 14
Feed
Team board
All
Schedule risk
Delay attribution
Integrity
Progress
Schedule risk
★
12 activities lost more than half their float this update.
Ask AI about this
4 reactions
Delay attribution
★
Switchgear delivery now drives 27% of the energization delay.
Ask AI about this
6 reactions
Integrity
★
3 checks fell below your standard on version 14.
Ask AI about this
2 reactions
Progress
★
Electrical is 9 points behind plan, up from 4 last month.
Ask AI about this
3 reactions
Email me the top 5 insights on every upload

Automated workflows

Set the question once. Get the answer every week.

Run any AI Mode prompt weekly or monthly, or when a new version lands, a baseline changes, integrity drops or a QSRA finishes. One workflow can cover every project in your portfolio.

  • Many projects at once
  • Run now
  • Clone
  • Run history
  • External recipients
Weekly delay summary
Clone
Run now
PROJECTS
DC Alpha
DC Charlie
DC Echo
+ 4 more
TRIGGER
Weekly, Monday 07:00
PROMPT
Which activities on or near the critical path lost the most float since the last update? Rank them and explain the cause.
SEND TO
Planning lead
Portfolio director
client.pm@external.com
RUN HISTORY
Mon 07:00
DC Echo
v14
Continue in chat
Mon 07:00
DC Charlie
v9
Continue in chat
Mon 07:00
DC Alpha
v22
Continue in chat
New email
now
Nodes & Links: Weekly delay summary
Inbox
1 new
Nodes & Links
Mon 07:02
To: Planning lead, Portfolio director
Weekly delay summary: DC Echo lost the most float
C.U.2006 switchgear delivery dropped 9 days of float and now drives the energization date.
Review in the platform

Outputs

Take the answer anywhere.

Every answer can leave the chat as a deck, a report, an email or a spreadsheet, or travel to site on the mobile app.

AI Mode ExportPowerPoint
DC ECHO · MONTHLY REVIEWEnergization is 21 days at risk.Switchgear delivery and change order CO-114 drive almost half the delay. Recovery options are on slide 3.
Delay contribution to energization
Switchgear delivery27%
CO-114 steel20%
Site access permit13%
Roof steel11%
Cable tray logic9%
ENERGIZATION+21 days
P80 FINISH10 Jan 2028
TOP TWO DRIVERS47%
Generated by Nodes & Links AI · Version 142 / 5
Download PowerPoint

Built for your use cases

Ask it about the decisions that matter most.

Real questions, with real answers from customer projects, anonymized.

Integrity and compliance
Does this submission meet our schedule standard?
32%The check covered 382 of 1,179 links. Across the full schedule it was 91.4%.
See the use case
Progress verification
Where does the contractor’s report disagree with the schedule?
79.9%The report claims 89% of hours earned. Its own tables show 79.9%.
See the use case
Change management
What changed since last month, and did it hit the critical path?
+114dThe critical path grew from 249 to 363 days in one submission.
See the use case
Delay recovery
What slipped, why, and how do we win it back?
1 cause50 activities slipped exactly 7 days, all from one drainage package.
See the use case
Risk and forecasting
When will we really finish, and what could change it?
281dThe P50 moved 281 days while the schedule moved only 24.
See the use case
Schedule acceleration
Where can we safely pull in the end date?
22 of 38Float covers 22 of the 38 days. Parallel reviews find the rest.
See the use case
Disputes and claims
Who owns this delay, and what’s the evidence?
848848 logic changes in a single revision, with completion out 112 days.
See the use case
Seven use cases. One ground truth.
All use cases

Two modes, one ground truth

Want to check the math? Switch to Platform Mode.

Every AI answer is one click from the model behind it, with every number open for your experts to verify.

AI MODE
Switchgear delivery drives 27% of the delay.
Delay Navigator
CO-114
PLATFORM MODE
Switchgear
CO-114
Permit
Roof steel

FAQ

Questions, answered.

Questions about AI Mode.

Talk to our team

Any project controls question about your schedules, documents and standards, from one project to your whole portfolio. Every answer runs through the ground truth models.

Type @ to mention a project or a schedule version, and the AI loads it as context. Ask across every project you can access with Global AI.

Yes. Every answer shows its reasoning steps, the models it used and its sources, and any activity in the answer opens straight into Platform Mode.

Yes. Attach progress reports, delay notices, meeting minutes or specifications in the chat, and connected Aconex and Procore documents are already available.

A named, shared workspace created from a chat, including its files. It stays accessible as new schedule versions arrive, so your analysis carries forward.