New: Document Integrations with Aconex and Procore are live. See what your AI can read now

Platform / Platform Mode

The complete project controls platform.

Every screen your experts rely on, from Gantt and integrity to QSRA, earned value and change control, in one place, with or without AI.

DC Echo Version 14
Platform Mode
Home
Gantt
Integrity
Progress
EVM
Change Control
Delay Navigator
Risk
PAD
Latest update vs. baseline
Baseline → Version 14
Finish date
29 Jun 2027
20 Jul 2027
+21 days
Total float
+6d
−12d
−18 days
Integrity
82.8%
84.9%
+2.1 pts
Driving logic changes
0
14
+14 this update
Critical path
C.U.2006 Install switchgear
C.U.3278 Pull HV cables
C.U.4100 Energize Data Hall 1
C.U.4210 Commissioning
Integrity, last 5 updates

Built for experts

Every view a planner expects, and a few they’ve always wanted.

Switch between schedule, critical path and targeted path on one Gantt, collapse overlapping paths into distinct sequences, save your layouts as named views, bookmark the activities you watch and find any activity even with a typo.

  • Critical and targeted paths
  • Distinct paths
  • Saved views
  • Bookmarks
  • Fuzzy search
  • Filter by contractor code
Schedule
Critical path
Targeted path
View: Weekly lookahead
swtchgear
C.U.2006 Install switchgear
C.U.3278 Pull HV cables, south
C.U.3298 Pull HV cables, north
C.U.4100 Energize Data Hall 1
C.U.4210 Commissioning tests

Connections

See the whole network, not just the bars.

Explore the activity network as a graph or a timeline, highlight the critical path, and trace how delay moves through the logic, even on a 50,000-activity schedule.

  • Graph and timeline
  • Critical path highlight
  • Out-of-sequence logic
Connections
Graph
Timeline
Critical path highlighted · stays interactive at 50,000 activities

Portfolio mode

Every project’s health, on one screen.

A map colored by health, the most delayed, most stale and worst-integrity projects ranked, KPI thresholds set once for everyone, and coordinators assigned to every project and programme.

  • Portfolio map
  • KPI thresholds
  • Coordinators
  • Programme filters
Portfolio overview
DC AlphaDC CharlieDC Foxtrot
MOST DELAYED
DC Charlie
+64d
DC Delta
+41d
WORST INTEGRITY
DC Charlie
79%
DC Foxtrot
82%

Built for big programmes

From first upload to fiftieth version.

Upload up to 10 XER or MPP versions at once, or import straight from Oracle Primavera Cloud with baselines and scenarios. Settings carry across every new version.

  • Multi-version upload
  • XER and MPP
  • Primavera Cloud import
Bring every version in at once
DC_Echo_v12.xer
Ready
DC_Echo_v13.xer
Ready
DC_Echo_v14.xer
Processing
Rail_Package_B.mpp
Ready
Oracle Primavera CloudImport baselines and scenarios directly

Documents

The project record, tied to the work.

Documents, RFIs and change orders flow in from your connected tools and map to WBS elements and activity codes, so every delay has its paperwork beside it.

  • Map to WBS and codes
  • Aconex, Procore, Autodesk, Trimble
  • Ask AI about any document
Project documents, mapped to the schedule
Delay notice DN-014.pdf
C.U WBS · Electrical
RFI 2,031 cable tray clash
Data Hall 1 · Contractor B
CO-114 structural instruction
4 data halls
Oracle Aconex
Procore
Autodesk
Trimble

Enterprise ready

Governance built in, not bolted on.

Roles that match how your teams work, Integrity templates admins apply across every project, enforced MFA for every user, and workspace standards only admins can change.

  • Roles and permissions
  • Integrity templates
  • Enforced MFA
Enterprise controls
Platform Admin
Workspace standards, users and security
Contributor
Upload schedules and run every analysis
Member
Collaborate without uploading or creating projects
INTEGRITY TEMPLATES
Owner standard
38 projects
Contractor submission
12 projects
Custom
3 projects
Require MFA for all users

Built for your use cases

Every use case, on the screens your experts trust.

Each use case opens on the models behind it.

Two modes, one ground truth

Want a faster answer? Switch to AI Mode.

Ask in plain language and get an answer grounded in the same models, with every source attached.

AI MODE
Switchgear delivery drives 27% of the delay.
Delay Navigator
CO-114
PLATFORM MODE
Switchgear
CO-114
Permit
Roof steel

FAQ

Questions, answered.

Questions about Platform Mode.

Talk to our team

The full project controls platform: Gantt and critical path, integrity, progress, earned value, change control, delay analysis, risk, forecasting and optimization, without needing the AI.

XER and MPP files, uploaded up to 10 versions at a time, plus direct import from Oracle Primavera Cloud with baselines and scenarios.

Yes. Platform Mode is built for large programmes, including 50,000-activity schedules in the Connections network view.

Yes. Portfolio mode shows every project’s health, delay and integrity in one place, against KPI thresholds your admins set for everyone.

Any time. Switch to AI Mode for a plain-language answer, and open any activity from an AI answer back in Platform Mode.