01
Hard to get started.
Acumen Fuse + Risk: On average 70 buttons, switches, tabs and menus per screen, lengthy tutorials and a 220-page manual.
Nodes & Links: Ready to use from the first login.
Use cases
By organization
Featured stories
Latest from the blog
AI with full project context: Connect Nodes & Links with AconexNovember 5, 2026All blog posts →Featured guide
GuideThe Executive Guide to AI for Project DeliveryTest date confidence, understand project risk and focus interventions, with auditable evidence.Read the guide →All guides →Watch, read and learn
WebinarsLive sessions and on-demand replays.WhitepapersLong reads on where project delivery is going.ResearchThe peer-reviewed work behind the models.Case studiesHow teams use Nodes & Links on live projects.The Physics of Project AccelerationOur book on pulling project dates forward.All resources →Fuse + Risk makes risk analysis a specialist job. Nodes & Links loads the schedule with AI estimates in minutes, so you can test assumptions live in the workshop.
At a glance
Why teams switch
Acumen Fuse + Risk: On average 70 buttons, switches, tabs and menus per screen, lengthy tutorials and a 220-page manual.
Nodes & Links: Ready to use from the first login.
Acumen Fuse + Risk: Uncertainty is assigned by hand across 1,000s of activities, which is slow and based on intuition.
Nodes & Links: AI estimates for every activity or WBS from your project’s own performance, mixed with yours, for a loaded schedule in minutes.
Acumen Fuse + Risk: The workflow and a slow QSRA engine mean you don’t get the most out of risk workshops.
Nodes & Links: Test assumptions in real time, in a safe sandbox, with the room.
Acumen Fuse + Risk: At least a year’s commitment and $10,500, 4 to 6 months of procurement, and the risk sits with you.
Nodes & Links: Free to start, saving at least 250 hours of workload.
Real projects, real results
Ground truth models
Ask in plain language, or drop into Platform Mode and check the math yourself.
Download as PDF
Nodes & Links vs Acumen Fuse + Risk, feature by feature, ready to share with procurement and your project leads.
Yes. Test assumptions in real time in a safe sandbox, and see the effect on P50 and P80 dates as you go.
No. Nodes & Links runs in the browser. Connect Primavera P6, Oracle Primavera Cloud or Microsoft Project, or upload a schedule.
No. Customer data is never used to train AI or LLM models, and each customer’s data stays in its own environment.