WebinarsLive sessions and on-demand replays.WhitepapersLong reads on where project delivery is going.ResearchThe peer-reviewed work behind the models.Case studiesHow teams use Nodes & Links on live projects.The Physics of Project AccelerationOur book on pulling project dates forward.All resources →Customer stories / Energy facility
Commissioning delays were starting to compound.
The team used Delay Navigator and Schedule Optimizer to get to the answer, with every result traceable to the schedule.
One question, with the root cause traced through the schedule.
What drove the delay, by reason
Original plan against the optimized schedule
Answered in the same meeting, preventing 14 days of compounding delay.
The same delay recovery analysis, available to every team. Shown here as examples, not part of this story’s results.
Across every project I can access, which ones slipped since the last update, and what is driving each slip?
The team used Delay Navigator and Schedule Optimizer to get to the answer, with every result traceable to the schedule.
One question, with the root cause traced through the schedule.
What drove the delay, by reason
Original plan against the optimized schedule
Answered in the same meeting, preventing 14 days of compounding delay.
The same delay recovery analysis, available to every team. Shown here as examples, not part of this story’s results.
Across every project I can access, which ones slipped since the last update, and what is driving each slip?
The team used Delay Navigator and Schedule Optimizer to get to the answer, with every result traceable to the schedule.
One question, with the root cause traced through the schedule.
What drove the delay, by reason
Original plan against the optimized schedule
Answered in the same meeting, preventing 14 days of compounding delay.
The same delay recovery analysis, available to every team. Shown here as examples, not part of this story’s results.
Across every project I can access, which ones slipped since the last update, and what is driving each slip?
An answer is only useful if it holds up. Nodes & Links records the reasoning and model outputs behind every answer, so the team can see each step, check the math and share a recommendation that’s traceable.
What’s driving the delay, right now?
Yes. Every story comes from a real customer project. Some are anonymized to protect sensitive programs.
They’re listed under “Under the hood” on this page, with a link to the full use case.
Every project is different, but the same models and AI Mode are available to every customer. Book a demo to see them on projects like yours.
On the Customers page, where you can filter every story by use case.